|  A tower section is lifted from the barge,  Lake Trader
 |  Frozen tie-down straps speak of a rough trip coming here
 |  An empty truck gets ready to receive the tower section
 | 
|  The tower section is lowered onto the truck
 |  Rear of the section drops into a cradle on the truck
 |  Close-up of ice on the tie-down straps at front of section
 | 
|  Mary E. Hannah steadies the barge as it is unloaded
 |  Another tower section is lifted by the mobile cranes
 |  Ice is visible on the top of the tower section
 | 
|  Brrrrr!!
 |  A different truck waits to receive a load
 |  Truck backing in under the waiting tower section
 | 
|  More ice at the front of the section
 |  The other end is lowered into the cradle on the trailer
 |  Section is just about secured
 | 
|  Ice on the tower section in the storage area of the dock
 |  Close-up of the iced area of the section
 |  A view from the Ogden Street (Menekaunee) Bridge
 | 
|  Also in port is the Pere Marquette 41/ Undaunted
 |  It is being loaded with large rock for lower Lake Michigan
 |  Mantsinen crane drops a load onto the barge
 | 
|  ... and heads back for more
 |  Close-up of the crane preparing to grab a load of rocks
 |  ... and lowering the rocks onto the barge
 | 
|  A view from astern as loading continues
 |  The crane grabs more rocks
 |  ... and stretches out to lower it onto the barge
 | 
|  Note the picnic table on the stern of the tug, Undaunted
 |  Front-end loader moves rocks from storage area across road
 |  ... and drops it into position for the crane to pick up
 | 
|  Crane picks up a load of the rock dropped by loader
 |  |  |