|  Wind turbine tower lifted from hold
 |  
 |  Truck waits for the tower to be loaded onto it
 | 
|  
 |  
 |  
 | 
|  
 |  Dock workers position the huge part
 |  The tower is affixed to the truck with a cable & turnbuckle
 | 
|  A final adjustment is made and the truck is ready to go
 |  Cranes at the storage site lift the tower from the truck
 |  A view of the unloading from the Ogden Street Bridge
 | 
|  
 |  
 |  
 | 
|  
 |  
 |  
 | 
|  A few more feet and this tower will be ready to go to the storage area
 |  |  |